Showing posts with label Design. Show all posts
Showing posts with label Design. Show all posts
Saturday, August 15, 2020
Thursday, November 15, 2018
Electrical Power System - Career Advice
Electrical Power System Career in California
Power System Interview
Lighting Questions
Short Circuit Calculation Questions
Grounding Questions
Coordination Questions
Arc Flash Analysis
National Electrical Code
IEEE Codes
UPS Installation -
Transformer
VFD Motor
Power Factor Correction
Voltage Drop Calculation
Generator
Transmission
Fire Alarm
Specification Guide
Power System Interview
Lighting Questions
Short Circuit Calculation Questions
Grounding Questions
Coordination Questions
Arc Flash Analysis
National Electrical Code
IEEE Codes
UPS Installation -
Transformer
VFD Motor
Power Factor Correction
Voltage Drop Calculation
Generator
Transmission
Fire Alarm
Specification Guide
Sunday, January 19, 2014
10. Wiring and Safety Components for PV Solar Systems
Main Subjects
EMT(Electric Metallic Conduit) used for long run, less expensive, inside & outside application
FMT(Flexible Metallic conduit) Used for indoor application, for shot run ,more cost, less labor.
Non-Mettalic conduit - Rigid PVC, - Used for underground / Outside building.
Disconnect Switches
As per Utility requirements, PV Circuit and Inverter output should be lockable disconnect switch.
One Lockable Disconnect switch should be near the meter and should be visible and utility can access 24/7 .
will be operated by utility service person.
Selection of Fuse/ Circuit Breaker
For High Voltage DC Applications, the Fuse should be Selected accordingly.
Case Study:-
Ground Fault Protection
Is a standard in Grid Tied inverter.
Refer
solarprofessional.com
Labeling Requirements
DC Disconnect.
Utility Power Interconnection Point.
Building Exterior - Should have details of PV Source and all disconnection of the system.
========================================================================
CASE STUDY -1
========================================================================
Cable - B
Max. Output Current X 1.25 =
- Type of cables and Characteristics used in Solar PV Systems.
- Selection of Conduit
- Disconnect Switches
- Selection of Fuse/ Circuit Breaker
- Ground Fault Protection
- Labeling Requirements
- Underground Service Entrance Cable - for outdoor applications. not designed for fire ratings.
- External Wiring -
- Building Wiring (Internal Applications) - THHN, THWN - Heat Resistant Thermoplastic - doent run outside building. No sunlight resistant Characteristics.
- Battery wiring - Moister Resistant Thermoset (EHW) Heat Resistant themoplastic, Flexible wiring is another choice, make sure terminals and legs are designed for battery use.
- Grounding Wiring - Bare copper or Insulated copper conductor.
Selection of Conduit
- Selection - Depends up on the location (dry/wet)
- Temperature of Installation.
- Flexible and Rigid
- Metallic Conduit
- Non-Metallic Conduit
EMT(Electric Metallic Conduit) used for long run, less expensive, inside & outside application
FMT(Flexible Metallic conduit) Used for indoor application, for shot run ,more cost, less labor.
Non-Mettalic conduit - Rigid PVC, - Used for underground / Outside building.
Disconnect Switches
As per Utility requirements, PV Circuit and Inverter output should be lockable disconnect switch.
One Lockable Disconnect switch should be near the meter and should be visible and utility can access 24/7 .
will be operated by utility service person.
Selection of Fuse/ Circuit Breaker
For High Voltage DC Applications, the Fuse should be Selected accordingly.
Case Study:-
Ground Fault Protection
Is a standard in Grid Tied inverter.
Refer
solarprofessional.com
Labeling Requirements
DC Disconnect.
Utility Power Interconnection Point.
Building Exterior - Should have details of PV Source and all disconnection of the system.
========================================================================
CASE STUDY -1
========================================================================
Cable - A
Reference 690.8A, 690.8B --> Connect from PV Module.
(No of modules (strings) wired in parallel) X (Short circuit current-Isc) X 1.25 (safety factor for irradiance) X 1.25(Cable safety factor)
Cable shall not carry 80% of Max.
Where the maximum Current is expected to continue for 3 Hours or more, considered as continuous load (NEC Code article 100)
Total Safety factor - 1.25x1.25 = 1.56
Isc - 5.5A
Cable Selection for PV - 1.56 X 5.5A = 8.6Amp
Cable - B
Max. Output Current X 1.25 =
Tuesday, January 14, 2014
Sunday, November 11, 2012
Live Drafting and Design Services
Live Design Services is a leading provider of AutoCAD Design Services Center. We cater to the needs of hundreds of organizations including industrial companies, engineering firms and construction companies.
We Specialized inElectrical Design and drafting services:
- Electrical Site Plans
- Electrical, Power and Lighting System plans
- Electrical Panel Schedules
- Electrical One Line Diagrams
- Layouts for lighting showing Lighting fixture, Emergency Lighting etc.
- Terminations Diagrams
- Control Circuits
- LLV/HV electrical devices
- Electrical Documentation Services
- 2D Cad Services
- Format conversion
- Take-off Sheets from Drawings
Our skilled draftsmen can convert paper drawing into high precision digital formats.We convert all types of drawings including mechanical, architectural, electrical, structural, and plumbing. The drawings are mainly converted into the following formats:
- TIFF
- JPEG
- DWG
- DXF
Tuesday, August 16, 2011
13. PV Solar System Wiring and Safety Devices
Selection of Cable and Safety devices will play an important role in the budget of the system
AC Voltage drop based on impedance
DC Voltage drop based in resistance
PV Cable Sizing
Maximum current = No of modules (strings) wired in parallel x the short circuit current Isc x 1.25
OCPD Sizing
Over Current Protection Device
The Conductors are designed for 80% of capacity for 3Hr continuous rating.
OCPD = 1.25 x 1.25 = 1.56-Multiplication factor'
Nominal Voltage - Baseline of measuring Voltage - PV Modules will be availabel @ 12V & 24V modules
Nominal Voltage - 12Volt
Operating Voltage - 17 to 18Volt
Solar PV System Devices
AC Voltage drop based on impedance
DC Voltage drop based in resistance
PV Cable Sizing
Maximum current = No of modules (strings) wired in parallel x the short circuit current Isc x 1.25
OCPD Sizing
Over Current Protection Device
The Conductors are designed for 80% of capacity for 3Hr continuous rating.
OCPD = 1.25 x 1.25 = 1.56-Multiplication factor'
Nominal Voltage - Baseline of measuring Voltage - PV Modules will be availabel @ 12V & 24V modules
Nominal Voltage - 12Volt
Operating Voltage - 17 to 18Volt
Solar PV System Devices
- Underground Feeder (UF)—may be used for interconnecting balance-of-systems (BOS) but not recommended for use within battery enclosures; single conductor UF wire may be used to interconnect modules in the array but this type of wire is not widely available.
- Tray Cable (TC)—multi-conductor TC wire may be used for interconnecting BOS; TC has good resistance to sunlight but may not be marked as such.
- Service Entrance (SE)—may be used for interconnecting BOS
- Underground Service Entrance (USE)—may be used for interconnecting modules or BOS; may be used within battery enclosures
- THHN—indicates wire with heat resistant thermoplastic sheathing; it may be used for interconnecting BOS but must be installed in conduit, either buried or above ground. It is resistant to moisture but should not be used in wet locations.
- TW—refers to moisture resistant thermoplastic sheathing; it may be used for interconnecting BOS but must be installed in conduit. May be used in wet locations.
Saturday, August 13, 2011
Interior Lighting Design - Calculations
Design calculation of Interior Lighting Design
Basic Technical Terns of Lighting Design
Flow of Light can be compared with the flow of water
COLOUR RENDERING INDEX (CRI) (of a lamp) - Is a measure of a lamp's colour rendering ability.
COLOUR TEMPERATURE (of a light source) - The temperature of a black body which emits radiation of the same chromaticity as the light source being considered.
Interior Lighting Calculation
LMF = Luminaire maintenance factor - the reduction in light output due to dirt deposited on or in the luminaire
RSMF = Room surface maintenance factor - the reduction in reflectance due to dirt deposition in the room surfaces
Step-by Step Method of lighting Design
1. Details required - Length, Ht, Required lux level, details of light fixture, Maintenance and Utility factor
2. Calculate the Lux level requirement
Case Study:-
Example 1.1
The illuminance (E) on the working plane is 500 lux.The reflectance is 50%, calculate the luminance of the working plane.
L = E x R(p.u.)
= 500 x .5 = 250 Apostilbs
= 250 / 3.14 = 80 cd/m2
Lamp Data for Lighting Designer
1. Initial Lumen Output - Lamp Output after 100Hours
2. Lighting Design Lumen Output - After 2000 Hours
3. Color Temperature
4. Color Rendering Index & Color Rendering Group
5. Physical Dimensions
6. Ballast Type - (Standard, Program Start etc, Electronic, etc)
7. Power Rating
Light Fixture Data for Lighting Designer
1. Photometric data
2. Space to Height ratio.
3. Utilization factor
4. Electrical Specifications
5. Mechanical Specifications
Day Light Advantages comparing to artificial light
1. Healthier and more satisfactory
2. Economic advantage
3. Good Color rendering.
- Basic Technical Terms of Lighting
- Formulas for calculations
- Step-by step method for calculating Lux level in a room
- Case Study
- Lamp Data - for a lighting Designer
- Light Fixture data - for a lighting Designer
- Day Lighting - Factors
Basic Technical Terns of Lighting Design
Flow of Light can be compared with the flow of water
quantity
|
symbol
|
unit
|
Description
|
Example
| ||
luminous flux
|
Φ
|
lumen (lm)
|
total quantity of light emitted per second by a light source
|
quantity of water passing a given point per second
| ||
luminous intensity
|
I
|
candela (cd)
|
concentration of light in a specific direction, radiated per second
|
intensity of a water jet in a given direction.
| ||
illuminance
|
E
|
lux (lx)
|
quantity of light, or luminous flux, falling on a unit area of a surface
|
amount of (rain)water falling on an area of surface per sec.
| ||
luminance
|
L
|
Candela/Sq Mtr (cd/m2)
|
luminous intensity emitted per Unit of area of a surface in a specific direction
| |||
Efficacy
|
lumens per watt
|
The ratio of lamp luminous flux divided by the power consumed by the lamp
|
Where control gear is taken into account the unit becomes lumens per circuit watt.
| |||
COLOUR RENDERING INDEX (CRI) (of a lamp) - Is a measure of a lamp's colour rendering ability.
COLOUR TEMPERATURE (of a light source) - The temperature of a black body which emits radiation of the same chromaticity as the light source being considered.
Interior Lighting Calculation
Formulas for calculations
F = initial lamp lumens
L = length of room
K =Room Index
N = number of luminaires
UF = utilisation factor
W = width of room
D = Distance between light source and work plane
Hm = height of luminaire above working plane
MF = maintenance factor
How to calculate illuminance?
(F x n x N x MF x UF)
E = ------------------------------
A
How to calculate average illuminance in a room?
lm
E(AV) = -----------
d x d
How to calculate Room Index?
This takes account of room proportions and height of the luminaire above the
working plane. It is used to determine the Utilization factor.
L x W
K =------------------
(L + W) x Hm
How to calculate average maintenance factor a room?
MF = LLMF x LSF x LMF x RSMF
lm
I = ----------
4 x 3.1
LLMF = Lamp lumen maintenance factor - the reduction in lumen output after specific burning hours
LSF = Lamp survival factor - the percentage of lamp failures after specific burning hoursLMF = Luminaire maintenance factor - the reduction in light output due to dirt deposited on or in the luminaire
RSMF = Room surface maintenance factor - the reduction in reflectance due to dirt deposition in the room surfaces
Step-by Step Method of lighting Design
1. Details required - Length, Ht, Required lux level, details of light fixture, Maintenance and Utility factor
2. Calculate the Lux level requirement
Case Study:-
Example 1.1
The illuminance (E) on the working plane is 500 lux.The reflectance is 50%, calculate the luminance of the working plane.
L = E x R(p.u.)
= 500 x .5 = 250 Apostilbs
= 250 / 3.14 = 80 cd/m2
Lamp Data for Lighting Designer
1. Initial Lumen Output - Lamp Output after 100Hours
2. Lighting Design Lumen Output - After 2000 Hours
3. Color Temperature
4. Color Rendering Index & Color Rendering Group
5. Physical Dimensions
6. Ballast Type - (Standard, Program Start etc, Electronic, etc)
7. Power Rating
Light Fixture Data for Lighting Designer
1. Photometric data
2. Space to Height ratio.
3. Utilization factor
4. Electrical Specifications
5. Mechanical Specifications
Day Light Advantages comparing to artificial light
1. Healthier and more satisfactory
2. Economic advantage
3. Good Color rendering.
Subscribe to:
Posts (Atom)
CCNA Network Practice for Genetec Engineers
CCNA Practice Flashcards for Genetec Engineers — 500 Questions CCNA Practice Flashcards for Genetec Engineers 500 multiple-ch...
-
Introduction In some short circuit studies, the X/R ratio is ignored when comparing the short circuit rating of the equipment to the avai...
-
210 Branch Circuit 215 Feeders 220 Bracnh.. Calculations 240 Over current protection 250 Grounding and Bonding 320 Armor...
-
Genetec University Security Center Omnicast 5.10 Recertification Exam Time Left: 58m 38s You must answer all questio...